Select regional version:

Download

The object content is configured for use in UK, but it may also be suitable for use in other locations.

Tags:

For the formation of bonded, unbonded and floating or heated screed on both existing and new concrete prior to the installation of wood, PVC, linoleum, ceramic tiles, natural stone, carpet or any other flooring where rapid drying is required for short installation times. Suitable for indoor and outdoor use. Sets to light foot traffic after 12 hours, ceramic tiles can be laid after 24 hours., resilient and wooden flooring after 4 days. Suitable for patching and repairing floor screeds where rapid installation is required and the preparation of floor screeds incorporating underfloor heating systems.

Platform Compatible Version Certified to
IFC IFC - 1 2.0
Revit Revit 2016 + 1 2.0

  • Properties and values
  • More information
  • More BIM objects

Properties and values

IFC
IfcExportAs
IfcCoveringType
IfcExportType
FLOORING
COBie
BOS_General
NBS_Data
Admixture
n/a
Cement
n/a
CoarseAggregate
Required
DrySolidsContent
1
FibreReinforcement
Mapefibre NS12
FineAggregate
Required
Mix
250 kg of Topcem with 1 m³ of aggregate (diameter from 0-8 mm)
TemperatureWhenInUse
-30°C to +90°C
Pset_CoveringCommon

More information

  • NBS specification data
    Case studies and technical literature
  • More BIM objects