Ancon ESDQ-L20 Lockable Dowel

Ancon Lockable Dowels are used at temporary movement joints in post-tensioned concrete. They transfer shear and accommodate an initial phase of movement before being locked.

Features:

  • Slab-to-slab solution.
  • Allows initial concrete shrinkage before dowel is locked with plate/resin.
  • Locked dowel continues to transfer shear.
  • Replaces pour strips.
  • Reduces slab propping times.
  • Two-part construction (dowel and sleeve unit) ensures dowel alignment and simplifies installation.
Platform Compatible Version Certified to
AECOsim AECOsim - 1.0 -
ARCHICAD ARCHICAD - 1.0 -
IFC IFC 2X3 3 1.3
Revit Revit 2015 + 3 1.3
Vectorworks Vectorworks - 1.0 -

Download

President Way
President Park
Sheffield
South Yorkshire
S4 7UR

Tel +44 (0)114 275 5224

Need specialist advice?
Get technical help
 
  • More BIM objects
  • What's Changed?

More BIM objects

What's Changed?

27/02/2017

Changes to reflect updates to the NBS BIM Object Standard v1.3

  • Removal of Uniclass2 property
  • Addition of Uniclass 2015 properties
  • Addition of COBie Category property value

Objects have also been updated to Revit 2015

Terms and conditions

Please agree to the updated terms and conditions

Thank you, your registration was complete
Thank you
Your query has been sent.

A technical consultant from will be in touch soon.
Manufacturers using NBS National BIM Library adhere to our code of conduct.